F-35 costs based on LRIP 5 contracts:
F-35A: $172 million per aircraft;
F-35B: $291.7 million per aircraft;
F-35C: $235.8 million per aircraft
To be fair, these costs will probably come down in real dollars when they ramp up the production volume.
On the other hand, it will never go down to a reasonable number, which I am willing to accept $100M flyaway as at this point.
There are also a lot of miscellaneous of logistics costs involved with adapting it over something like a Rhino that aren't covered here. E.g. overhauling our entire tanker fleet.
Recently Canada has commented that it reserves the right to cancel orders based on cost.
No comments:
Post a Comment